Production Process

 

 

0. Steel Raw Materials
0. Steel Raw Materials
1. Laser Programming
1. Laser Programming
2. Laser Cutting
2. Laser Cutting
3. Plate Shearing
3. Plate Shearing
4. Punch Press
4. Punch Press
5. Hydroforming
5. Hydroforming
6. Robot Welding
6. Robot Welding
7. Manual Welding
7. Manual Welding
8. Grinding
8. Grinding
9. Powder-Coated Truck Frame
9. Powder-Coated Truck Frame
10. Powder Coat Components 10-1 After
10. Powder Coat Components
10-1 After
11. Hydraulic Cylinder Production Workshop
11. Hydraulic Cylinder Production Workshop
12. Pressure & Leakage Testing → Sorting Qualified Cylinders Post-Test
12. Pressure & Leakage Testing → Sorting Qualified Cylinders Post-Test
13. Wheel Forming → Bearing Press Fitting → Wheel Assembly Testing
13. Wheel Forming → Bearing Press Fitting → Wheel Assembly Testing
14. Wheel Assembly To Cylinder
14. Wheel assembly to cylinder
15. Frame Assembly
15. Frame Assembly
16. Finish Production
16. Finish production
17. 48-Hour Continuous Intensive Test And A Label For Trucks Passed The Test
17. 48-hour continuous intensive test and a label for trucks passed the test
18. Dismantle The Handles And Pack 6 Units Per Wooden Pallet Uniformly
18. Dismantle The Handles And Pack 6 Units Per Wooden Pallet Uniformly
19. Palletize And Inspect, Then Store In Finished Product Warehouse
19. Palletize And Inspect, Then Store In Finished Product Warehouse
20. Load Into Container
Load Into Container
Load Into Container
Load Into Container
20.Load Into Container >>